Projects

Hydroelectric Plant El Toqui

Power: 2.20 MW
Place: Aurancanía

Auxiliars d'Explotacions Energètiques took care of the electric installation of lower and higher voltage. At the same time some works which were needed for the installation of the new machine were done. 

  • New machine  (14160)
  • Inst. Elect. B.T. (14160)
  • Inst. Elect. M.T. (15029)